C&I energy storage

Commercial and industrial battery energy storage systems

C&I battery storage sourcing for peak shaving, self-consumption, backup power and energy management from cabinet to container scale.

Application guidance

Start with the operating requirement.

C&I storage should be sized from the operating objective and interval load data. PCS power controls how fast energy moves; battery kWh controls duration. BMS, EMS, cooling, fire protection, grid interface and site compliance must be evaluated as one system.

Project inputs

Three decisions that shape the system.

Reference packages accelerate procurement, but final configuration must reflect the site, market and operating conditions.

01

Business objective

Quantify demand-charge reduction, backup value, solar self-consumption or time-of-use savings.

02

Power and energy

Size kW against peak demand and kWh against the required discharge duration and cycling strategy.

03

Site integration

Confirm transformer, switchgear, available space, ambient temperature, enclosure, fire code and EMS connection.

Reference architecture

Coordinated as one energy system.

Final model selection, electrical design, protection and certification are confirmed during project review.

01

LFP battery racks or cabinet

Selected and documented against the project architecture and destination-market requirements.

02

Bidirectional PCS

Selected and documented against the project architecture and destination-market requirements.

03

BMS and site EMS

Selected and documented against the project architecture and destination-market requirements.

04

Thermal management

Selected and documented against the project architecture and destination-market requirements.

05

Fire detection and suppression

Selected and documented against the project architecture and destination-market requirements.

06

Grid and load metering

Selected and documented against the project architecture and destination-market requirements.

Frequently asked questions

Answers for procurement and engineering teams.

What is a common C&I storage duration?

Two to four hours is common, but the correct duration depends on the load curve, tariff, backup target and project economics.

Is an all-in-one cabinet suitable for every site?

No. Cabinet, modular block and container architectures serve different power, energy, space and compliance requirements.

Can SolarXport coordinate battery, PCS and EMS?

Yes. SolarXport can review available integrated and component-level platforms against the project architecture.

SolarXport project support

Move from application to an equipment shortlist.

Review the relevant product portfolio, then send the project country, capacity, operating objective and delivery schedule.

View product portfolio